Pakistan karachi nuclear power K1 and K2 units, hydrazine dosing equipment, phosphate dosing equipment, high and low temperature steam water sampling device

Karachi nuclear power plant is a CANDU type heavy water reactor nuclear power plant with a design power of 137mw and a design life of 30 years. It was put into commercial operation in 1972. After analysis and evidence collection, the power plant has obtained 15 years of life extension, and the operation life is up to 2019. Karachi nuclear power plant has been in continuous operation for 131 days in 2000, with an availability rate of 85.8%.

Karachi nuclear power project (K2, K3) is the largest nuclear power project in Pakistan. The plant site is located along the Arabian Sea, near Karachi City, Pakistan, about 900km away from Islamabad, the capital of Pakistan. According to the data of the business office of the Consulate General in Karachi at coordinates (24 ° 51 'n, 66 ° 47' e), the total amount of Karachi nuclear power project is US $9.6 billion, the Chinese loan is US $6.5 billion, and the power generation capacity is 2.2 million KW. The domestic hualong-1 (acp-1000) technology is adopted, and the project is undertaken by Zhongyuan Foreign Engineering Co., Ltd.

The construction of K-2 unit was started on August 20, 2015, and the first grid connection was completed in March 2021; At 01:15 on May 20, 2021, the 100 hour continuous and stable operation acceptance of pakistan karachi nuclear power unit 2 (K-2), the overseas first reactor project of "Hualong 1", was completed, all performance indicators met the standards and officially put into commercial operation, marking the successful completion of the first unit of China's independent third-generation nuclear power "going global". [